tappet clearance peugeot 505

You search Auto repair manual PDF tappet clearance peugeot 505, if there are search results will appear below. If search results do not exist, please search by others keyword.



  tappet clearance peugeot 505 Direct Download speed 5282 Kb/s

  tappet clearance peugeot 505 Full Version speed 6162 Kb/s



S&S Connecting Rods Installation Instructions

0

Filed Under (S&S) by admin on 29-10-2010

download
1. Female rod crankpin end to mainshaft nuts – .030″ minimum clearance recommended. A. Install sprocket shaft and crankpin in driveside flywheel. Snug nuts only. Do not torque to final specs. B. Slide connecting rods and bearings over crankpin. C. Rotate rods on crankpin, and observe clearance between rod and sprocket shaft nut. D. If additional clearance is needed, remove material from sprocket shaft nut. Do not remove material from connecting rod. E. Repeat procedure for camside flywheel and pinion shaft. 2. Female rod crankpin end to inner flywheel rim – .060″ clearance recommended. A. While checking female rod to mainshaft clearance, observe clearance between crankpin end of female rod and rim of both flywheels. B. If additional clearance is required, remove material from flywheel at point of contact. Do not remove material from connecting rod. 3. Wristpin end of both female and male rods to flywheel edge -.060″ minimum clearance recommended. A. While checking female rod to mainshaft clearance, observe clearance between wristpin end of both rods and rim of both flywheels. B. If additional clearance is required, remove material from flywheel at point of contact. Do not remove material from connecting rod. 4. Wristpin end to crankcase and cylinder – .060″ is recommended in these areas. A. With the camside flywheel and rods mocked up, install the assembly in the right crankcase half with pistons (less rings) and cylinders in place. B. Rotate flywheel through one full revolution and check for rod to crankcase and cylinder spigot contact on both the front and rear of each cylinder. C. File or grind crankcase or cylinder spigot as needed to achieve .060″ clearance. Do not remove morematerial than needed. D. Repeat for left crankcase half. NOTE: Whenever clearancing is performed in any of these areas, do not remove any material from the connecting rods as clearancing on the rods may unnecessarily weaken them. Make adjustments to the point of contact on the mainshaft nut, flywheel rim, crankcase, cylinder spigot, etc. Connecting rods weakened by clearancing may fail causing serious engine damage.

Incoming search terms:

PEUGEOT HYbrid 3 compressor

0

Filed Under (Peugeot) by admin on 12-11-2010

download
HYbrid3 compressor concept is a means of transport with no affi liation to a particular type of vehicle. With its three wheels and its streamlined body, it is something of a missing link between two worlds which to date are quite distinct: that of the scooter and that of the car. With an electric motor in each of its two front wheels, coupled at the rear with a petrol engine, it brings into play very innovative hybrid technologies allowing each of its wheels to provide motive power. In a world of intensifying urban traffi c where everyone is trying to save time, where oil prices are skyrocketing and the environment is more than ever a priority, design departments are vying in ingenuity to develop solutions for the future. Giving full rein to their creativity and expertise, two separate Peugeot teams converged on a similar idea and fi nally worked in tandem to develop a particularly original project: the HYbrid3 compressor . This ”concept car”, or rather ”concept scooter”, is based on the extensive experience of Peugeot Motorcycles, specialists in the scooter fi eld, as well as the creativity and innovative capabilities of stylists and engineers working for Automobiles Peugeot. To create this concept, Peugeot was able to draw on its extensive experience in the world of transportation enabling each individual, according to their age or their needs, to choose from among the Marque’s cycles, motorcycles and cars

Harley-Davidson Evolution Engines, Hydraulic Lifter Limited Travel Kit Installation Manual

0

Filed Under (Harley Davidson) by admin on 23-10-2010

download
Remove tappet assemblies from engine being sure that each one is kept with it’soriginal tappet block. NOTE: This procedure is the preferred method of installation. However, kit can be installed without removing lifters from engine. 2. Remove hydraulic piston retaining wire clip from one assembly at a time. Be careful not to bend wire clip during disassembly. 3. Completely disassemble tappet removing all parts. 4. Thoroughly clean all parts including tappet body. Remove any oil which might prevent hydraulic unit from fully collapsing during adjustment. 5. Insert one spacer from S&S HL 2 Tkit in tappet body. 6. Reassemble tappet in reverse order making sure original parts arereturned to their original positions. See Picture1. 7. Replace wire retaining clip in tappet body. 8. Put tappet back in original tappet block. 9. Repeat Steps 2 through 8 for three remaining tappets. 10. Reassemble engine with modified tappets. 11. Adjust pushrods. NOTE – In all cases engine must be cold and lifter must be at lowest point of travel for pushrod adjustment To prevent accidents, remove ground cable from battery. A. Remove spark plugs. B. Bring piston to TDC on compression stroke in cylinder to be adjusted. Normally both tappets will be at their lowest point of travel. C. Extend pushrod adjustment, collapsing lifter until piston assembly is in contact with HL 2 Tspacer and pushrod is tight. If tappets contain oil, as when pushrods are readjusted after engine has been run, or if all oil was not removed during installation, extend pushrod adjustment until valve is open (about five additional turns of adjusting screw). Allow 5 minutes for hydraulic unit to bleed down. If pushrod can be turned with fingers after bleeding down, lifter is not completely collapsed, and this step must be repeated. NOTE – perform this operation on one cylinder at a time. Do not turn engine until pushrod adjustment is complete. Turning engine while valve is held off the seat could result in valve to valve or valve to piston contact and serious valve train damage. D. Loosen pushrod adjustment until pushrod can be rotated with the fingers with slight drag. NOTE – Shortening adjuster an additional six flats or full turn from zero lash often results in quieter pushrod operation. This provides additional travel for the hydraulic piston assembly, which can improve the ability of the hydraulic unit to maintain zerolash under normal operating conditions. E. Tighten lock nut. F. Follow the same procedure for all four push rods. G. Recheck pushrod adjustment after a few hundred miles. NOTES ● It is a good idea to recheck pushrod adjustment in a new engine as valve train may tighten up due to gasket compression and valve seat wear. ● Upon initial start up after modification, HL 2 Tequipped lifters may be somewhat noisy for 10-20 miles. If lifters are still noisy after 20 miles it is recommended that pushrods be adjusted 1⁄2 turnlooser. See step D

Lilac LS-18 Motorcycle Maintenance Standards

0

Filed Under (Lilac) by admin on 25-11-2010

download
CYLINDER AND CYLINDER HEAD MAINTENANCE ITEM STANDARD REPAIR LIMIT METHOD REMARKS Cylinder Bore 54 -0.01 54.1 Boring After boring honing should be performed Ovality 0.01 0.05 Boring After boring honing should be performed Taper 0.01 0.05 Boring After boring honing should be performed Oversize 0.25 steps 55 max. Do R and L cylinders at same time / 4 steps Valve Seat Width 0.8 – 1.0 1.3 Adjust Use a cutter Angle 45∞ Combustion Chamber Volume 18.2cc -0.5cc Remove carbon if heavy accumulation Compression Ratio 7.8:1 Head Gasket Thickness 1.0 Cylinder Head Nut Torque 3.0 kg/m (22 ft.-lb.) Out standard Adjust 8mm nut Intake and Exhaust Ports Port Wall SurfaceMust be smooth Remove carbon Intake and Exh. Valve GuidesOD 12 +0.09 +0.1 ID 7 +0.01 -0.0 7.06 Exchange Intake Valve Stem Diameter 7 -0.02 -0.03 6.9 Exchange Head Thickness 1 0.7 Exchange Exhaust Valve Stem Diameter 7 -0.02 -0.03 6.9 Exchange Head Thickness 1 0.7 Exchange Intake and Exhaust Valve Seat Face Width Range 0.8~1.0 1.3 Use valve seat cutter Intake Valve Guide Clearance 0.02~0.04 0.08 Replace valve or guide Exhaust Valve Guide Clearance 0.06~0.08 0.12 Replace valve or guide Valve Spring (Large) Installed Load 10.2 kg 8.7 kg Replace Fitted length 31.5 Free Length 36.5 34.7 Replace Tilt 1.5/100 3/100 Replace Valve Spring (Small) Installed Load 5.48 kg 4.65 kg Replace Fitted length 29.5 Page 4 of 10 Free Length 33.5 31.8 Replace Tilt 1.5/100 3/100 Replace Rocker Arm ID 12 +0.00 +0.02112.07 Replace Rocker Shaft OD 12 -0.06 -0.024 11.92 Replace Arm and Shaft Clearance 0.045~0.006 0.10 Replace arm or shaft Tappet Clearance 0.05 Out standard Adjust Measure cold at TDC Rocker Arm Ball Surface 1.8îR -0.006 -0.024 Replace if severe wear Pushrod Bend 0.1 0.5 Straighten Over 100mm (2) CRANKSHAFT, PISTON AND CONROD MAINTENANCE ITEM STANDARD REPAIR LIMIT METHOD REMARKS Piston OD @ Top 53.65 -0.02 Max Diameter 53.95 -0.015 53.85 Replace Ovality 0.1 Piston and Cylinder Clearance 0.04~0.05 0.15 Replace Piston Ring Groove Clearance 0.03~0.07 0.10 Replace Piston Oversize Step 0.25 4 steps Top Ring and 2nd Ring Thickness 2 -0.01 -0.03 1.92 Replace Width 2.5 -0.01 0.55kg Tension 0.85 – 1.15kg 1 Replace End Gap 0.15 – 0.35 Replace Oil Ring Thickness 3.2 -0.01 -0.03 3.12 Replace Width 2.5 -0.1 Tension 1.0~1.3kg 0.65kg Replace End Gap 0.15~0.35 1 Replace Ring Gap Position 120∞ 3 equal spacesOut standard Adjust Avoid Piston Pin Axis Ring Oversizes 0.25 steps 4 steps Piston Pin OD 15 -0.0 +0.006 14.95 Replace Pin Hole in Piston ID 15 +0.012 -0.015.05 Replace Pin and Piston Clearance -0.006 ~ +0.012 0.06 Replace Hand push fit piston at 100∞C Conrod Small End Bush ID 15+0.027+0.016 15.07 Replace bush Conrod and Piston Pin Clearance 0.01~0.027 0.07 Replace Crankpin OD 24.94 +0.0+0.0124.90 Replace Crankpin Roller OD 5 (+0.001+0.003) Refer to conrod ID Replace 3Sizes; 52 per assembly for selective fit 5 (+0.0 -0.002) 5 (-0.003 -0.005) Conrod ID 34.95+0.03+0.02435.02 Axial Play 0.2~0.4 0.5 Adjust Radial Play 0.026~0.036 0.06 Replace

Incoming search terms:

HARLEY-DAVIDSON FLH/ FLT MODELS 1985-1996 REAR LOWERING KIT INSTALLATION INSTRUCTIONS

0

Filed Under (Harley Davidson) by admin on 04-03-2012

download
may encounter clearance problems when re-installing the saddlebags. Check for a minimum of 5mm. clearance to prevent damage to the saddlebags. Measure clearance in the recessed area in the “backside” of the saddlebags where the shock sits. Check front, back and side clearance. THE BAGS MUST INSTALL WITHOUT UNDO FORCE. If they don’t, they are hitting the shock and/or shock boot. ****************** Inspect the clearance through the full range of motion of the swing arm ******************* n If more clearance is required, three suggested options are as follows: 1. Place washers between the mounting points where the saddlebags attach to the rails. This will move the bag slightly outward and away from the shock body. NOTE: On saddlebags utilizing DZUS FASTENERS (’85-’92), replace these with bolt/nut combination (as on ’93-’94 years). This will allow you to use washers to gain necessary clearance. 2. Remove or slide off the rubber boot that covers the shock shaft and attaches the body of the shock. The boot can be modified and reattached to the shaft (not the body) and secured with nylon ties and/or removed completely. This should gain you a minimum of 3mm of clearance. 3. Slot and/or space the saddlebag “rail/frame cage” mounting holes to allow the entire frame assembly to be moved out slightly from the shock body. You should use this modification only as a last resort n Lower motorcycle and check preload (shock spring stiffness). Adjustment may be necessary to suit personal preference in ride comfort. Read your Harley-Davidson owners manual for procedure. Test Ride.

Harley Davidson 6- SPEED CONVERSION KIT FOR BIG TWIN 5- SPEED TRANSMISSIONS INSTALLATION

0

Filed Under (Harley Davidson) by admin on 05-03-2012

download
5/16 Bolt hole boss clearance This can easily be checked with the trap door gasket. Put the gasket on the dowel pins. AII material of the boss around the hole that “sticks outside” the gasket (60 degrees forward to 60 degree backwards) must be removed (see figure A). Primary fork clearance Place the gasket on the housing and remove material as indicated for clearing the shifter fork (see figure B). WWW . ZODIAC . NL PERFORMANCE PRODUCTS FOR HARLEY-DAVIDSON ® INSTALLATION INSTRUCTIONS FOR 6 SPEED CONVERSION KIT AND 6 SPEED BUILDER KIT speed transmission. Also make sure you have a 1990 or later Factory Service Manual available. Tools The conversion kit should only be used in new or low milage transmissions. If gears or bearings of a used Gear set Removal Refer to the Factory Service Manual Section for Mainshaft and Countershaft removal. When you get to the point of actually sliding the gear set out make sure you properly mark the 5th gear set as described in the Factory Service Manual (for used transmissions only). Further follow the factory removal procedure. Clearance Checks The 6 Speed conversion and builder kit will fit in most OEM or aftermarket transmission housings without may be needed. The following clearances must be checked before assembling the 6 speed transmission. 28-05-2008 We recommend the kits are installed by a qualified mechanic with knowledge of the Harley-Davidson 5 needed are the same as used for a 5 Speed transmission. 5 speed transmission are worn, new ones must be installed, or better, the builder kit should be used. any modification of the housing. However due to casting differences, in some instances some modification
WWW . ZODIAC . NL PERFORMANCE PRODUCTS FOR HARLEY-DAVIDSON ® Pillow block clearance (right side) Make sure there is clearance between the pillow block and the housing. Any clearance is O.K. (see figure C). Fork shaft support clearance Again use the gasket as the template and remove the material as indicated (see figure D). Shift drum end play The end play of the shift drum must be checked prior to final installation. Install the shift drum. Measure the end play with feeler gauges at the right pillow block (see figure E). End play should be between .004″ and .010″, some 1/2″ X 7/8″ 0.008″ thick shims are included to adjust the end play

Incoming search terms:

2000 Celica GTS REPAIR MANUAL CORRECTION: VALVE CLEARANCE ADJUSTMENT

0

Filed Under (Toyota Manuals) by admin on 07-06-2011

Download
Repair Manual corrections have been made to the Valve Clearance Adjustment procedures for the 2000 model year Celica GTS with the 2ZZ–GE engine to allow effective use of the Special Service Tool. For more information on replacement of the SST Swing Arm refer to TSB SS002–00, Valve Clearance Adjusting compressor Swing Arm Retrofit – ’00 Celica GTS

HARLEY DAVIDSON SCREAMIN' EAGLE TWIN CAM 103 (1690 CC) CONVERSION KIT INSTALLATION MANUAL

0

Filed Under (Harley Davidson) by admin on 19-02-2011

download
REMOVAL When servicing the fuel system, do not smoke or allow open flame or sparks in the vicinity. Gasoline is extremely flammable and highly explosive, which could result in death or serious injury. (00330a) 1. Remove maxi-fuse. Refer to MAXI-FUSE INSTALLATION in Service Manual. 2. Remove existing air cleaner assembly. Discard filter element, backplate, and air cleaner cover insert but save remaining parts. Refer to AIR CLEANER REMOVAL in Service Manual. 3. Remove existing exhaust system. Discard mufflers but save remaining parts for kit installation. Refer to EXHAUST SYSTEM REMOVAL in Service Manual. 4. Remove engine from chassis following the instructions in the Service Manual. 5. Remove induction module. Refer to appropriate FUEL INJECTION section in Service Manual. 6. See Figure 1. Remove and save screw (with pilot sleeve) to release fuel supply tube clamp. is03165 Figure 1. Fuel Supply Tube Clamp Screw 7. See Figure 2. Pull fuel supply tube (1) from fuel rail. -J03825 1 of 10 1 2 3 3 4 is03166 1. Fuel supply tube 2. Sealing washer 3. O-ring 4. Screw (with pilot sleeve) Figure 2. Fuel Supply Tube Assembly 8. Remove sealing washer (2) and O-ring (3) from fuel supply tube. Remove second O-ring (3) from fuel rail bore. Discard sealing washer and O-rings. 9. See Figure 3. Pull fuel injectors (1) with attached fuel rail from induction module. To overcome the resistance of the bottom O-ring (2) on both fuel injectors, gently rock assembly back and forth while pulling. 10. Remove spring clips (3) from fuel injectors. Pull fuel injectors from fuel rail. To overcome the resistance of the top O-ring (4) on both fuel injectors, gently rock assembly back and forth while pulling. 11. Disassemble engine top end, engine bottom end, crankcase, and crankshaft. Refer to appropriate ENGINE sections in Service Manual. 1 2 4 3 is03167 1. Fuel injector 2. O-ring, bottom 3. Clip, spring 4. O-ring, top Figure 3. Fuel Injector Assembly INSTALLATION Inspect Cam Clearance A clearance problem between the new cam lobe and crankcase housing may exist on certain older model engines. Failure to maintain proper clearance could result in severe engine damage. (00391b) 1. See Figure 4. Prior to starting assembly procedures, insert new cams from kit into inner needle bearings (1) located in the right side crankcase and check for a minimum of 0.030 in. clearance between highest lift point of cam lobes and crankcase housing (2) with feeler gauges. NOTE If inadequate clearance is detected, crankcase housing must be machined to provide 1.060 in. Radius clearance from center of each cam bearing bore. After machining, recheck for minimum of 0.030 in. clearance

APRILIA PEGASO 650 STRADA Assembling instructions

0

Filed Under (Aprilia) by admin on 06-11-2010

download
Centre stand APRILIA PEGASO 650 STRADA Item-No.: 505.791 2 quantitem no. description 1 712.1002centre stand 2 151.124 bolt 17,7 x ø40 2 150.994 washer ø19 x ø30 x 2,7 4 150.995 washer ø8,4 x 3 2 150.841 hexagon bolt screw M 8 x 30 2 150.978 retaining pin 3,2 x 40 1 150.979 spring set Typ 5 1 275.001 limitation rubber The kit includes the following parts: Please check now the function of your centre stand and control all screw connections after the assembly for tightness! General: Centrestand cornering clearance: HEPCO & BECKER centerstands are carefully designed and tested to eliminate reductions in cornering clearance and ground clearance under most driving conditions on an unmodified stock motorcycle, and are certified to be compliant with European ABE safety standards. Use of any centrestand may reduce corning clearance or ground clearance under extreme driving situations. HEPCO & BECKER products should be installed by a qualified, experienced motorcycle technican. If you are unsure of your ability to properly install a product, please have the product installed by your local motorcycle dealer. HEPCO & BECKER takes no resposibility for demages caused by improper installation. All screws, bolts, and nuts, including all replacement hard ware provided by HEPCO & BECKER, should be tightened to the torque specified in the OEM maintenance manual for your motorcycle. If no torque specifications are provided in the OEM maintenance manual, the following torques may be used: M 6 – 9,6 Nm M 8 – 23 Nm M 10 – 46 Nm All screws, bots und nuts should be checked after driving the first 50 km to ensure that all are tightened to the proper torque. Medium strength liquid thread-locker (i.e., „Locktite”

S&S 106" Stroker Hot Set Up Kit For Victory Freedom Engines

0

Filed Under (Victory) by admin on 12-11-2010

download
Follow the Transmission & Crankshaft section of your Victory motorcycle service manual for disassembling your Victory engine. 2-Your new S&S crankshaft and connecting rods will require assembly. S&S connecting rods aremachined to use the Orange Victory® rod bearings that are included in the kit (Bearing P/N 3514390-159). Perform rod bearing clearance inspection as follows: A-Wash or clean all of the following components: crankshaft crankpin, rods and rod bores, bearing inserts. B-Place a strip of Plastigauge®across the width of the crankpin. NOTE: Green Plastigauge (.001-.003″) is commonly used for this procedure, it can be purchased at the local automotive parts store. Do not place Plastigauge across oil holes. Be careful not to allow the rods to move during the rest of the inspection procedure. C-Mark the rod and cap at the separation line with a Sharpie®, Dykem®, or permanent marker to prevent rod caps from getting swapped from their original rod during the inspection and assembly process. See Picture2. Picture 1 S&S Crankshaft & Connecting Rods NOTE: Bearings not shown. 3 Picture 2 WARNING
D-Install connecting rods and bearing caps in the same order they were received. E-Torque rod bolts to 5 ft-lbs to seat caps. Then final torque bolts to 40 ft-lbs. F-Remove bearing caps carefully to prevent disturbing the Plastigauge®. G-Measure the widest part of the crushed Plastigauge to determine the rod bearing clearance. Do so by using the bands provided on the Plastigauge label. See Picture 3. H-Specification for oil clearance is: .00091″-.00279″ l If the resultant clearance is less than this specification, the bearings will need to be replaced with the thinner black color coded bearings, not available through S&S (Victory®P/N 3514390-067). l If the resultant clearance is greater than the specification, the bearings will need to be replaced with the thicker blue color coded bearings, not available through S&S (VictoryP/N 3514390-027). l If clearance is not within specification, clean old Plastigauge off components and reassemble rods to crankpin with a new strip of Plastigauge and the thinner or thicker bearings as determined above

Incoming search terms: