suzuki max hundred showroom right

You search Auto repair manual PDF suzuki max hundred showroom right, if there are search results will appear below. If search results do not exist, please search by others keyword.



  suzuki max hundred showroom right Direct Download speed 5282 Kb/s

  suzuki max hundred showroom right Full Version speed 6162 Kb/s



Suzuki M 109 WINDSHIELD INSTALLATION AND OWNER'S MANUAL

0

Filed Under (Suzuki) by admin on 18-02-2012

download
Position the motorcycle securely on its stand or a work stand. Cover the front fender and fuel tank with a cloth to avoid scratches from dropped tools. 1. Use the above diagram toidentify left from right Lower and Upper Mount Brackets. Figure 1 2. Cut each of the clamp spacers in half to make 8 pieces, each 2.5 x 1.55″. 3. Apply one spacer to the inside of each mount bracket. Figure 2 Figure 1 Figure 2 N28201 and N28202 WINDSHIELD INSTALLATION AND OWNER’S MANUAL for Suzuki®M109 Right and Left side of Motorcycle is determined while sitting on the bike. Determine left from right Upper bracket. Washer angles inboard about 5 degrees. Note, Angle distinguishes Right from Left Lower Mount Bracket 1 2 4 3 5 6 8 9 10 National Cycle, Inc. Maywood, IL 60153-0158 USA 708-343-0400 / Fax: 708-343-0625 www.nationalcycle.com / e mail:info@nationalcycle.com Page 1 of 3 10-114056-000 08/07 / Rev B. 03/08 7 3, Left Upper Bracket 4, Right Upper Bracket About 5 0 inboard angle
INSTALLATION Measurements provided for clamp location. From this point you can adjust the brackets 1″ (22mm) higher if you prefer keeping in mind, position of the front nose of windshield should have a minimum of 1/2″ (13mm) clearance from cowling . Figure 3. Right Side Lower Mount Assembly 1. Start on the Right Side of motorcycle. At the top of the fork, place one inner black clamp on the fork tube. Figure 4 2. Hook the RIGHT SIDE lower mount bracket (2) to the inside clamp. Figure 5 3. Slide assembly down fork so bottom edge of bracket is 1.75″ (44mm) from top of lower triple clamp. Adjust bracket so flat in bracket runs parallel with motorcycle. Figure 6 and 7 4. Loosely install one M8 x 16 screw. (6mm Hex Key) Figure 7 Right Side Upper Mount Assembly 5. Place the second inside black clamp on the right fork tube.

1994-2003 Suzuki GSXR750 and 1997-2004 Suzuki GSXR600 Superbike Kit INSTALLATION INSTRUCTIONS

0

Filed Under (Suzuki) by admin on 10-01-2011

download
Step 1: Identify the key components that complete our Superbike kit: You should have 2 lines (front kit), 1 double banjo bolt and 2 lower adapters. There are also a total of 7 washers. 5 will be used, and 2 are spares. We strongly suggest having a professional mechanic install these brake lines; all other installations VOID warranty. Inspect your brake system after every race. Step 2: To ensure no paint damage from a brake fluid spill, completely cover the front end of the bike. This process is messy, and brake fluid WILL drip! Step 3: Uninstall stock hoses; be aware of how the stock system was routed in case you need to re-install it. Step 4: Install the Galfer adapters onto the right and left calipers. Thread each adapter into the calipers with one washer, and torque at 12 to 13 ft pounds. (See picture S4) Step 5: Install the right and left lines to the calipers, using the shorter line on the right side. These lines will travel from the master cylinder to the calipers; a double banjo bolt (see picture S5) is included to run two lines down. The positioning sequence on the master cylinder is as follows: Master cylinder, washer, straight banjo (from right line), washer, 12-degree banjo (from left line), washer, and double banjo hex. Double banjo bolt torque level is 12 FT Pounds. ( See picture S6) Make sure that the 90-degree fittings on each caliper are pointing away from the bike just a little bit (see pictures S7 through S9 of calipers) . Thread each banjo end into the adapter, and torque to 6 ½ Ft pounds. Before you proceed to the next step, please check for clearance of the lines. Compress the front end to make sure that the lines are not binding with anything. When the front end is fully extended or fully compressed, double check that the lines are traveling correctly and clear from any obstructions. Once the lines have been checked for clearance, we recommend using a zip-tie to bring the lines together about an inch above the lower triple clamp area. (Picture S10) Step 6: Bleed brake system according to owner’s manual, and build appropriate pressure. Finishing with DOT 4-brake fluid is recommended.

Incoming search terms:

Suzuki INTRUDER 1400 SLIP-ON EXHAUST SYSTEM Installation Manual

0

Filed Under (Suzuki) by admin on 22-12-2010

download
REMOVING THE STOCK EXHAUST SYSTEM 1. Loosenthe mounting bolt and pinch clamp on both left and right hand mufflers. 2. Loosenthe clamp on the crossover tube, located between the two mufflers. 3. Remove the two nuts that mount the front head pipe flange to the cylinder head. 4. Remove the two nuts that mount the rear head pipe flange to the cylinder head. 5. Remove the head pipes using a twisting motion to break the seal at the muffler and to clear the cylinder head. Note : If the exhaust coupler gaskets did not remain in the mufflers, remove them from the head pipes at this time. These coupler gaskets will not be reused in your new exhaust system. 6. Remove the mounting bolt from the left hand muffler. Remove the muffler, again using a twisting motion to seperate the crossover tube and set the muffler aside. (Save the stock mounting hardware for reuse). 7. Repeat step #6 on the the right hand muffler. Set the muffler aside. INSTALLING YOUR NEW VANCE & HINES EXHAUST SYSTEM 1. Check the stock exhaust gaskets to be sure they are in good shape. If you have any doubts as to their condition, replace them. 2. Reinstall the stock head pipes to the engine. Note : Leave the flange nuts loose at this time. 3. Remove the mufflers from their boxes. There are a left and right hand muffler in this system. To define the difference between the left and right mufflers, check the bracket that is welded to the back side of the muffler. Each muffler is stamped with it’s own part number. Part # D500 is the RIGHT muffler and Part # D550 is the LEFTmuffler. 4. Install a three hole mounting bracket to each of the mufflers. Slide one dog bone shaped nut plate under the bracket that is welded to the backside of each muffler. Attach the mounting bracket using two of the 5/16 flange head bolts (supplied), leave them loose at this time. Note : Each muffler bracket has a number stamped on it, #179 bracket is for the left hand muffler and #180 is for the right hand muffler. When the brackets are mounted correctly, the end of the bracket with the single hole should point to the inlet end (small end) of the muffler. Refer to figure 1.

SUZUKI MOTORCYCLES Gsxr 600, Gsxr 750, Gsxr 1000 teak the lead

0

Filed Under (Suzuki) by admin on 12-11-2010

download
The launch of the sixth generation of Gsxr marked a shift in Suzuki’s emphasis on two fronts. One, the Gsxr 1000 now took the upper hand in the development stakes. Historically, the Gsxr 750 led the march-arriving first, gaining the most recent technology, absorbing the lion’s share of corporate pride-but by 2003 the Gsxr 1000 was in the lead. Two, the Gsxr 1000 represents another, more subtle shift for Suzuki engineering, in which the designers-the lucky guys who get to clothe these amazing machines-have more freedom of expression. With this generation, the designs turned edgier, sharper, more aggressive looking than ever. What’s more, the Gsxr 1000 K3 would be the proving ground for a host of changes brought to the Gsxr 600 and Gsxr 750 for 2004. In fact, nearly every upgrade to the smaller bikes appeared on the Gsxr 1000 a year before. But the real impetus for driving the Gsxr 1000 to the head of development and, indeed, shortening its development cycle was competition both on the track and in the showroom. For the track, it was understood that Superbike racing would revert to allowing 1000 cc four-cylinder bikes in place of the 750s that had been the limit since 1982. In 2002, Yoshimura and Mat Mladin barely lost the AMA Superbike crown to Nicky Hayden aboard the Honda RC5!. But it would be the RC’s swan song of competitiveness with the change to 1000 cc fours. To keep speeds in check, the AMA Superbike rules would require 1000 cc fours to have some additional limitations compared to the twins and triples. For example, “Cylinder heads may be ported and machined, but altering of valve angles will not be permitted; aftermarket valves, springs, retainers, and other valve-train components will be permitted; valves must be stock size and same basic material as original equipment; aftermarket camshafts will be permitted, but earn lift and resulting valve lift must be no greater than stock. “In addition, the “stock crankshaft must be retained, The only allowable modifications are balancing, polishing of bearing surfaces and attachment of accessory drives. Homologated transmission gear sets (one optional set of ratios per approved model) will be permitted. Optional sets will be price-controlled and must be available to any legitimate AMA Superbike competitor. Homologated fuel-injection throttle-body assemblies (one optional type per approved model) and aftermarket airboxes will be permitted. Modifications to throttle bodies will not be permitted. Optional throttle bodies will be price-controlled and must be available to any legitimate AMA Superbike competitor.” The thinking was simple: keep the liter bikes from sucking through massive throttle bodies, and the horsepower might not (and, it was hoped, would not) go through the roof. In preparation for racing, Suzuki moto wanted to make a host of small changes to the Gsxr 1000, but its motivation was also to keep the bike at the forefront of open-class street bikes. Suzuki engineers knew that Honda and Kawasaki were readying all-new models-the CBR 954 RR and the ZX 9 R had long since been vanquished-and rumor had it that Yamaha was ready with yet another push with the R1.It was the right time to make alterations to the Gsxr 1000. Heading the list was, as one might expect, a revised engine.

Incoming search terms:

2003 SUZUKI SV 1000 Service Manual

0

Filed Under (Suzuki) by admin on 26-02-2011

download
HOW TO USE THIS MANUAL TO LOCATE WHAT YOU ARE LOOKING FOR : 1. The text of this manual is divided into sections . 2. The section titles are listed in the GROUP INDEX . 3 . Holding the manual as shown at the right will allow you to find the first page of the section easily . 4. The contents are listed on the first page of each section to help you find the item and page you need . COMPONENT PARTS AND WORK TO BE DONE Under the name of each system or unit, is its exploded view . Work instructions and other service information such as the tightening torque, lubricating points and locking agent points, are provided . Example: Front wheel SYMBOL Listed in the table below are the symbols indicating instructions and other information necessary for servicing. ENGINE OIL SUZUKIrecommends the use of SUZUKI PERFORMANCE 4 MOTOR OIL or an oil which is rated SF or SG under the API (American Petroleum Institute) service classification. The recommended viscosity is SAE 1 OW-40 . If an SAE 1 OW-40 oil is not available, select an altematice according to the right chart . BRAKE FLUID Specification and classification: DOT 4 A WARNING Since the brake system of this motorcycle is filled with a glycol-based brake fluid by the manufacturer, do not use or mix different types of fluid such as silicone-based and petroleum-based fluid for refilling the system, otherwise serious damage will result . Do not use any brake fluid taken from old or used or unsealed containers . Never re-use brake fluid left over from a previous servicing, which has been stored for a long period. FRONT FORK OIL Use fork oil L01 or an equivalent fork oil . GENERAL INFORMATION 1-5 ENGINE COOLANT Use an anti-freeze/engine coolant compatible with an aluminum radiator, mixed with distilled water only . WATER FOR MIXING Use distilled water only . Water other than distilled water can corrode and clog the aluminum radiator . ANTI-FREEZE/ENGINE COOLANT The engine coolant perform as a corrosion and rust inhibitor as well as anti-freeze . Therefore, the engine coolant should be used at all times even though the atmospheric temperature in your area does not go down to freezing point. Suzuki recommends the use of SUZUKI COOLANT anti-freeze/engine coolant. If this is not available, use an equivalent which is compatible with an aluminum radiator . LIQUID AMOUNT OF WATER/ENGINE COOLANT

SUZUKI VOLUSIA 800, C50, M50 Left/ Right Saddlebag Installation Manual

0

Filed Under (Suzuki) by admin on 14-11-2010

download
Your saddlebag supports will install in just a few minutes using common tools. Read all instructions carefully and completely before installing your new saddlebag supports. 1. Remove your stock fender rail bolts. 2. Install your Cobra saddlebag supports using the supplied 8mm x 65mm button head bolts (where the stock bolts were removed), the saddlebags should hang towards the rear and away from the motorcycle. 3. Torque bolts to factory specifications Cobra recommends you always wear a helmet while riding. Please never operate your motorcycle while under the influence of alcohol and/or drugs. Enjoy the new look of your motorcycle and please ride safely

SUZUKI 1400/ 800 INTRUDER TURN SIGNAL RELOCATION INSTALLATION AND CLEANING INSTRUCTIONS

0

Filed Under (Suzuki) by admin on 09-11-2010

download
1. Refer to Figure 1. 2. Remove seat. Safety: disconnect battery prior to all wiring modifications LeatherLyke 510 5/1/2009 3. Disconnect wires to turn signals. 4. Remove turn signals and retain hardware for reinstallation. Observe and mark “left” and “right” for reinstallation. Information: Do not remove license plate bracket . 5. Remove license plate. Turn signal bracket must be oriented with flange (side with only 2 holes) on top. 6. Install turn signal bracket behind license plate bracket and license plate using 6 x 35mm pan phil machine screws for the 800 or 6 x 20mm pan phil machine screws for the 1400, 1/4″ flat washers, and 6mm locknuts. Insert black spacer spool between license plate bracket and turn signal bracket. 7. Mount turn signals directly to turn signal bracket using 6 x 10mm hex cap screws and star lock washer. Information: Observe all color-coding of wires and splice one wire at a time. 8. Cut each turn signal wires three inches from end and splice 10 inches of supplied wire. Secure wires to inner fender clips. 9. Follow route of tail light wires and connect wires into harness. 10. Secure wires together behind license plate bracket with tie wrap. 11. Connect battery and test turn signals for function. 12. Install seat. Information: Not all license plate mounts are grounded. In some cases, it may be necessary to run a ground wire to turn signal bracket. WARNING: States may have minimum width requirements on motorcycle turn- signals, so check your local laws. LeatherLyke 510 5/1/2009 SADDLEBAG INSTALLATION 13. Refer to Figure 2. Information: Cover plates are pressed into strut. 14. Remove round cover plate at end of fender mount strut on right side. 15. Remove nut on right rear and replace with 1.2″ hex adapter. If hex adapter is less than flush with the outside of both fender struts, add a 5/16″ flat washer. 16. Assemble 5 x 30mm flathead screw and 5mm mounting spool with chamfer on spool under head of screw. Insert assembly thru 1 1/4″ fender washer for the 1400 or 1″ for the 800. 17. Install spool assembly into previously installed 1.2” hex adapter. Information: Do not remove washer on shock absorber. Hex adapter will protrude 1/4″ beyond fender strut. 18. Remove round cover plate over right rear shock, remove shock absorber nut and install .75″ hex adapter. 19. Assemble 5 x 30mm flathead screw, mounting spool and cup washer with chamfer on spool under head of screw. 20. Install spool assembly into previously installed hex adapter. 21. Insert 5/8” finishing plug into old turn signal hole on right side. 22. Repeat procedures on opposite side

SUZUKI PUTS THE 'STYLE' IN LIFESTYLE WITH CUSTOM ACCESSORIES INSTALLATION

0

Filed Under (Suzuki) by admin on 14-02-2012

download
Suzuki Genuine Accessories are available for the all-new Equator midsize pickup truck, four-door SX4 Sport, five-door SX4 Crossover, XL7 midsize crossover and rugged Grand Vitara. The accessories can be purchased through local Suzuki dealers. Suzuki Equator  All-weather floor mats – Rubberized all-weather mats, ideal for keeping dirt, moisture and harsh debris from coming in contact with the vehicle’s carpet interior.  Bluetooth® module – The Suzuki-integrated hands-free Bluetooth phone system features a clean installation, fresh look and works with most Bluetooth-enabled mobile phones. Quality sound plays through the vehicle’s factory stereo and speakers, and the phone system automatically mutes the radio during phone calls. (Also available for SX4 Sport, SX4 Crossover, Grand Vitara and XL7.)  Body side moldings – Durable polyurethane molding set helps protect exterior paint from door dings and road rash.  Hood mask – Durable vinyl, custom-fit mask helps protect the front end of the vehicle from damage caused by minor road debris.  iPod® interface kit – Provides a seamless connection from an iPod to the vehicle’s radio and/or steering-wheel audio controls. (Also available for SX4 Sport, SX4 Crossover, Grand Vitara and XL7.)

2008 Suzuki GSXR 600-750 Super bike Kit INSTALLATION INSTRUCTIONS

0

Filed Under (Suzuki) by admin on 29-01-2011

download
Step 1: Identify the key components that complete our SUPERBIKE brake line kit: You should have two (2) hoses, one (1) double banjo bolt, and two (2) male adapters with two 1.55mm thick washers. There are also a total of (7) washers. five (5) will be used, and two (2) are spares. We strongly suggest having a professional mechanic install these brake lines; all other installations VOID warranty. Step 2: To ensure no paint damage from a brake fluid spill, completely cover the front end of the bike. This process is messy, and brake fluid WILL drip! Step 3: Uninstall stock hoses; be aware of how the stock system was routed in case you need to re-install it. Step 4: Install the Galfer adapters onto the right and left calipers. Thread each adapter with the two thick crush washers provided into the calipers with one washer, and torque at 12 to 13 ft pounds. Step 5: Install the right and left lines to the calipers, using the shorter line on the right side. These lines will travel from the master cylinder to the calipers; a double banjo bolt is included to run two lines down. The positioning sequence on the master cylinder is as follows: Master cylinder, washer, 90 degree banjo from left line, washer, 90 banjo from right line, washer and double banjo hex. Double banjo bolt torque level is 12 FT Pounds. (For positioning see picture A) Make sure that the 90-degree fittings on each caliper are pointing away from the bike just a little bit (see picture B) . Thread each female end into the adapter, and torque to 6 ½ Ft pounds. Before you proceed to the next step, please check for clearance of the lines. Compress the front end to make sure that the lines are not binding with anything. When the front end is fully extended or fully compressed, double check that the lines are traveling correctly and clear from any obstructions. Once the lines have been checked for clearance, we recommend using (GALFER’S C-CLIP) to bring the lines together about the same level as the lower triple clamp.

2008 SUZUKI GSXR1300 Hayabusa Front Brake Line Kit INSTALLATION INSTRUCTIONS

0

Filed Under (Suzuki) by admin on 09-01-2011

download
Step 1: Identify the key components that complete our brake line kit: You should have two (2) hoses, one (1) double banjo bolt, and two (2) single banjo bolts. There are also a total of nine (9) washers. Seven (7) will be used, and two (2) are spares. We strongly suggest having a professional mechanic install these brake lines, and all other installations void warranty. Step 2: To ensure no paint damage from a brake fluid spill, completely cover the front end of the bike. This process is messy, and brake fluid WILL drip! Step 3: After drying out the OEM brake system, uninstall stock hoses. Take note of how the stock system was routed in case you need to re-install it. Please note there is a plastic shield on the lower triple clamp of your machine; we took this piece off to ease installation. Remove the OEM hose holder, and keep the bolt for later use. (See picture C) Step 4: Install the right and left (to your right and left as you sit on the bike) lines to the calipers, using the shorter line on the right side. These lines will travel from the master cylinder to the calipers; a double banjo bolt is included to run two lines down. The positioning sequence on the master cylinder is as follows: Double banjo hex, washer, straight banjo labeled for right line, washer, 12-degree banjo labeled for left line, washer, master cylinder. Please see picture A for reference! Double banjo bolts must be torqued at 12 FT pounds. Step 5: Route both brake lines through the enclosed c-clip, and attach to the lower triple clamp using the bolt from the OEM holder. (See picture B) Drop the lines down and thread the single banjo bolts at each caliper using the following sequence: single banjo hex, washer, 20-degree banjo, washer, thread into caliper. Torque banjo bolts to 12 FT pounds. Before you proceed to the next step, please check for clearance of the lines. Compress the front end to make sure that the lines are not binding with anything. When the front end is fully extended or fully compressed, double check that the lines are traveling correctly and clear from any obstructions