blok piston passion pro

You search Auto repair manual PDF blok piston passion pro, if there are search results will appear below. If search results do not exist, please search by others keyword.



  blok piston passion pro Direct Download speed 5282 Kb/s

  blok piston passion pro Full Version speed 6162 Kb/s



Harley-Davidson Big Twin Evolution and Twin Cam Edelbrock/ JE Sport INSTALLATION INSTRUCTIONSsman Pistons

0

Filed Under (Harley Davidson) by admin on 07-02-2011

download
INSTALLATION PROCEDURE Note: All Evolution® “Big Twin” pistons are marked “Front” or “Rear” and come with rings, wrist pins, and locks. • Note: We highly recommend that a dealer or trained mechanic perform the installation of these pistons. Specialized equipment is required for honing and finishing the cylinders to ensure long life of the piston and cylinder assembly. 1. Remove original equipment cylinders from engine. Refer to a shop manual or other reference book for specific steps, if needed. (Note: Care should be taken not to bend the studs or damage the cylinder during removal of the cylinders.) 2. With a small screwdriver, move the wrist pin retainer around to gain access to the tail of the retainer as it lines up with the notch in the bottom of the wrist pin hole. 3. Use a small screwdriver, pick or awl to roll the wrist pin retainer out of its groove. 4. Push wrist pin out and remove piston. 5. Repeat procedure for the other piston. 6. At this point, take cylinders, new pistons, and piston-to-wall clearance specifications to your dealer or machine shop to perform necessary machining operations. • IMPORTANT NOTE (Evolution® and Twin Cam®): The cylinder bore must be machined/honed to provide .0025″ of piston-to-wall clearance. Measure the piston diameter at a point .500″ up from the lower skirt (See Figure 3). 7. Starting with the front cylinder, install new piston rings and one wrist pin retaining clip (Note: Second ring has a dot which must face up when the ring is installed) . 8. Place the piston over the conecting rod, making sure that the intake valve pocket is towards the intake side. (For Evolution ® , see Figure 1. For Twin Cam ® , see Figure 2) . Coat the wrist pin with engine oil and insert it into the piston. Install the second wrist pin retainer into the groove. 9. Lightly coat the piston skirt with engine oil. Place a piston ring compressor over the piston/ring assembly and compress. Place the cylinder over the piston and gently push down until all rings are in the cylinder. Remove the ring compressor, and push the cylinder the rest of the way down. (Note: Be careful not to get oil onto the base gasket.) 10. Place two nuts and washers on opposite corners of the #1 cylinder to hold it down while you repeat the procedure for cylinder #2. 11. Assemble the rest of the engine per factory specifications. Start the engine and let it run at 2000 rpm for about 10 minutes.

PRO-CYCLE AND PRO-CYCLE XLT 1,000-Lbs. Capacity Motorcycle Lift

0

Filed Under (Tips and Review) by admin on 27-11-2010

download
1. Always inspect the lift for freight damage and make note of any damage on the bill of lading. 2. In case of freight damage, call the truck line immediately and report the damage as a freight claim. Final Set-Up for model Pro-Cycle This lift is more than 90% factory pre-assembled. The following steps will guide you through the final set-up. IT WOULD BE EASIER FOR TWO MEN TO COMPLETE FOLLOWING STEPS. 1. Unpack the lift from the shipping skid. With the lift table up side down, connect the air hose to the air cylinder (Part # 26). 2. After tightening the hose to the cylinder, flip the lift over with the table surface up. 5 3. Lift up the table manually to the first lock position to make sure the lift is rising freely. Lubricateing the joints again before use will ensure a better performance of the lift. 4. Connect the other end of the air hose to the foot-operated valve. Then connect the foot- operated valve to 100 PSI air supply. DO NOT USE AIR SUPPLY WITH PRESSURE MORE THAN 100 PSI. 5. Release the safety bar by pushing the handle down. Operate the foot valve by stepping on the footpad forward to raise the lift. The safety bar should engage the ladder automatically while lift is rising. Step on the footpad again to set the pad in middle position to stop the lift when it reaches the desired height. ALWAYS LOWER LIFT IN THE NEAREST LOCKED POSITION BEFORE BEGINNING WORK. NEVER USE THE LIFT UNLESS YOU ARE IN A LOCKED POSITION. The lift should never be left unattended while attached to air pressure. Disconnect the air pressure when lift is not attended by qualified persons. 6. Install the vise using bolts and nuts supplied with the lift (part # 6 to 12). See fig #1. 7. Install the approach ramp by dropping it into the holes punched on the rear edge of the table. The final Set-Up for the Pro-Cycle model is complete

Incoming search terms:

S&S Super Stock Cylinder Head Kit Installation Instructions for 1984 And Later Evolution Big Twin and Sportster Engines

0

Filed Under (Harley Davidson) by admin on 28-11-2010

download
check Piston Alignment in Cylinder Bore The purpose of this procedure is to check for and correct possible piston misalignment in the cylinder bore. During normal manufacturing, engine components such as crankcases, cylinders, and connecting rods can be machined to dimensions within factory specifications but on the extreme ends of the tolerance range. Sometimes these components when combined together form an assembly that is borderline or actually “out of print”. The worst result is that the pistons can run cocked in the cylinder bores causing the connecting rods to thrust to the sides exerting unnecessary stress on the pistons, rings, rod bearings and other related parts. This procedure is not the same as “blue printing”, but it provides almost the same result. We feel that not enough emphasis is given to checking the piston alignment in the cylinder bore. NOTE – All engines should be checked upon disassembly. This applies to any engine receiving new pistons which includes those being completely overhauled. CAUTION – Pistons which do not run true in cylinder bores may cause excessive connecting rod side thrusting. This may lead to premature ring, piston, connecting rod and rod bearing wear and eventual failure of these parts. Visual Procedure A. Reinstall cylinders on old pistons without rings. Hold cylinders securely in place. B. Move piston tight toward camside of engine. C. Turn engine over in normal direction of travel 2 or 3 revolutions and observe piston during process. D. Move piston toward driveside of engine and repeat Step C. If misalignment exists, piston will appear closer to cylinder wall at one point around circumference. Condition can be corrected by bending rod in opposite direction. Figure 1 shows an exaggerated side view. E. Repeat Steps B to D for other cylinder. F. Remove pistons and cylinders. Observe pistons for wear spots on sides above top compression ring. If either side near wristpin is worn clean while side opposite is carboned up, then piston was not running straight and true in cylinder bore. Piston will also generally show diagonal wear pattern on thrust faces of skirts and possibly signs of connecting rod to wristpin boss contact inside piston.

KTM 250 SX-F & XC-F Piston Kits Installation and Removal Manual

0

Filed Under (KTM) by admin on 28-01-2012

download
Features* Benefits •*Dedicated*forging •*Light*weight,*superior*strength,*optimized*design •*Stock*Compression •*Matches*OEM*compression*ratio •*Dome*design Improved*flame*travel*to*maximize*air/*fuel*burn*efficiency •*Chrome*plated*piston*pin •*Reduced*friction,*improved*scuff*resistance •*Horizontal*slot*pin*oiling .•*Improved*lubrication,*better*pin*oiling,*reduced*friction •*Pressure*seal*groove •*Maximum*ring*seal •*Skirt*coated •*Reduced*friction,*quieter*operation,*improved*scuff*resistance •*Dedicated*rings ……………………………… •*Optimized*for*each*application,*light*weight,*high*perfromance,*better*oil*control •*Experience ……………………………………. •*68*years*as*the*industry*leader*in*forged*piston*technology Piston sold complete*with:*Rings,*piston*pin,*and*circlips. Complete*top*end*kits*sold*complete*with:*Piston,*rings,*piston*pin,*circlips,*and*complete*top*end*gasket*kit

Lilac LS-18 Motorcycle Maintenance Standards

0

Filed Under (Lilac) by admin on 25-11-2010

download
CYLINDER AND CYLINDER HEAD MAINTENANCE ITEM STANDARD REPAIR LIMIT METHOD REMARKS Cylinder Bore 54 -0.01 54.1 Boring After boring honing should be performed Ovality 0.01 0.05 Boring After boring honing should be performed Taper 0.01 0.05 Boring After boring honing should be performed Oversize 0.25 steps 55 max. Do R and L cylinders at same time / 4 steps Valve Seat Width 0.8 – 1.0 1.3 Adjust Use a cutter Angle 45∞ Combustion Chamber Volume 18.2cc -0.5cc Remove carbon if heavy accumulation Compression Ratio 7.8:1 Head Gasket Thickness 1.0 Cylinder Head Nut Torque 3.0 kg/m (22 ft.-lb.) Out standard Adjust 8mm nut Intake and Exhaust Ports Port Wall SurfaceMust be smooth Remove carbon Intake and Exh. Valve GuidesOD 12 +0.09 +0.1 ID 7 +0.01 -0.0 7.06 Exchange Intake Valve Stem Diameter 7 -0.02 -0.03 6.9 Exchange Head Thickness 1 0.7 Exchange Exhaust Valve Stem Diameter 7 -0.02 -0.03 6.9 Exchange Head Thickness 1 0.7 Exchange Intake and Exhaust Valve Seat Face Width Range 0.8~1.0 1.3 Use valve seat cutter Intake Valve Guide Clearance 0.02~0.04 0.08 Replace valve or guide Exhaust Valve Guide Clearance 0.06~0.08 0.12 Replace valve or guide Valve Spring (Large) Installed Load 10.2 kg 8.7 kg Replace Fitted length 31.5 Free Length 36.5 34.7 Replace Tilt 1.5/100 3/100 Replace Valve Spring (Small) Installed Load 5.48 kg 4.65 kg Replace Fitted length 29.5 Page 4 of 10 Free Length 33.5 31.8 Replace Tilt 1.5/100 3/100 Replace Rocker Arm ID 12 +0.00 +0.02112.07 Replace Rocker Shaft OD 12 -0.06 -0.024 11.92 Replace Arm and Shaft Clearance 0.045~0.006 0.10 Replace arm or shaft Tappet Clearance 0.05 Out standard Adjust Measure cold at TDC Rocker Arm Ball Surface 1.8îR -0.006 -0.024 Replace if severe wear Pushrod Bend 0.1 0.5 Straighten Over 100mm (2) CRANKSHAFT, PISTON AND CONROD MAINTENANCE ITEM STANDARD REPAIR LIMIT METHOD REMARKS Piston OD @ Top 53.65 -0.02 Max Diameter 53.95 -0.015 53.85 Replace Ovality 0.1 Piston and Cylinder Clearance 0.04~0.05 0.15 Replace Piston Ring Groove Clearance 0.03~0.07 0.10 Replace Piston Oversize Step 0.25 4 steps Top Ring and 2nd Ring Thickness 2 -0.01 -0.03 1.92 Replace Width 2.5 -0.01 0.55kg Tension 0.85 – 1.15kg 1 Replace End Gap 0.15 – 0.35 Replace Oil Ring Thickness 3.2 -0.01 -0.03 3.12 Replace Width 2.5 -0.1 Tension 1.0~1.3kg 0.65kg Replace End Gap 0.15~0.35 1 Replace Ring Gap Position 120∞ 3 equal spacesOut standard Adjust Avoid Piston Pin Axis Ring Oversizes 0.25 steps 4 steps Piston Pin OD 15 -0.0 +0.006 14.95 Replace Pin Hole in Piston ID 15 +0.012 -0.015.05 Replace Pin and Piston Clearance -0.006 ~ +0.012 0.06 Replace Hand push fit piston at 100∞C Conrod Small End Bush ID 15+0.027+0.016 15.07 Replace bush Conrod and Piston Pin Clearance 0.01~0.027 0.07 Replace Crankpin OD 24.94 +0.0+0.0124.90 Replace Crankpin Roller OD 5 (+0.001+0.003) Refer to conrod ID Replace 3Sizes; 52 per assembly for selective fit 5 (+0.0 -0.002) 5 (-0.003 -0.005) Conrod ID 34.95+0.03+0.02435.02 Axial Play 0.2~0.4 0.5 Adjust Radial Play 0.026~0.036 0.06 Replace

Incoming search terms:

HARLEY-DAVIDSON V-ROD BIG BORE KIT INSTALLATION INSTRUCTIONS

0

Filed Under (Harley Davidson) by admin on 31-10-2010

download
The cylinder sleeves provided with the Wiseco V-Rod big bore kit have been finished honed to size and the piston to cylinder clearance has been set. Prior to installation, the sleeves must be washed in hot soapy water (not parts washer solvent) and dried. Coat the bore surface with motor oil and wipe it with a white towel. If the towel shows any remaining grit, repeat the hot soapy water washing process until the towel will only show clean motor oil. CAUTION: Test fit the cleaned sleeve (without O-Rings installed) into the engine block. Sleeve should drop into position. If sleeve will not easily drop into position, warm the engine block with a hair dryer until sleeve will drop into position. Remove sleeve, then continue installation procedures. From the bottom side of the sleeve, gently roll the 2-cylinder sleeve O-rings into the two grooves on each sleeve. Apply motor oil to the O-rings and gently install the sleeves into the block until bottomed. CAUTION: DO NOT ATTEMPT TO INSTALL SLEEVES WITHOUT LUBRICATING THE O-RINGS. FAILURE TO LUBRICATE O-RINGS COULD RESULT IN TORN OR DAMAGED O-RINGS THAT WOULD NOT BE EVIDENT UNTIL ENGINE WAS STARTED. INCORRECTLY INSTALLED O-RINGS CAN RESULT IN CATASTROPHIC ENGINE DAMAGE. NOTE: REFER TO THE OEM SERVICE MANUAL FOR ALL TORQUE SPECIFICATIONS PISTON RING PREPARATION Wiseco V-Rod pistons incorporate an advanced 2 ring system • The top ring is file-fit, and as such, requires that the end gap must be clearanced. The proper end gap clearance is .016-.018″ with the ring installed squarely in the bore. The top ring must be installed on the piston with the dot marking toward the top of the piston. • The oil ring is comprised of the expander and two rails. Install the expander first, and then the rails. Check to make sure the expander tips have not overlapped. It is not necessary to clearance the end gaps on the oil rails. The rails should be installed without modification. PISTON INSTALLATION The Wiseco V-Rod big bore kit is supplied with pistons that are front and rear cylinder specific. Install the front piston 4792M10795 in the front cylinder with the arrow facing the front of the engine. Install the rear piston 4793M10795 in the rear cylinder with the arrow facing the front of the engine. A piston ring compressor is required to install the pistons into the cylinders. Front of engine ➔ 4792M10795 ( Front piston) 4793M10795 ( Rear piston) FWD 4793M10795 FWD 4792M10795 For further information call the Wiseco Tech Line:

Incoming search terms:

HONDA CB 90O C CYLINDER HEAD PISTON REMOVAL and INSTALLATION

0

Filed Under (Honda) by admin on 05-12-2011

download
108 CYLINDER/PISTON PISTON/PISTON RING INSPEC- TION I Inspect the piston ring-to-groove clearance. NOTE Mark the rings so that they can be returned to their original locations. Inspect the pistons for damage and cracks; ring grooves for wear. Insert each piston ring into the cylinder, and inspect the end gap

YAMAHA PRO-R AIR CLEANER REMOVAL AND INSTALLATION MANUAL

0

Filed Under (Yamaha) by admin on 07-01-2012

download
STEP 1 Remove the seat, fuel tank, and OEM air cleaner assembly. Disconnect the hoses connected to the air cleaner while leaving them connected to the motorcycle. Save the clamp that secures the air duct to the carburetor and the OEM fasteners used to secure the stock air cleaner assembly to the motorcycle as some will be reused. STEP 2 Remove the carburetor according to the section in your Road Star factory service manual that outlines procedures for carburetor removal, disassembly, reassembly and installation. Now is a good time to proceed with re-jetting the carburetor. We have supplied jets to cover many common configurations. For jet locations and jetting recommendations with various exhaust combinations see Addendum I. Since the OEM screws retaining the float bowl are easily damaged, we have included replacement M4 socket head cap screws to replace them, if necessary. STEP 3 Insert the rubber intake duct into the main support bracket as shown in PIC. 1. The rubber nipple should be pointing toward the longest leg of the bracket. STEP 4 Insert the rubber intake duct into the Pro R-series Hypercharger in the same fashion it was installed in the main support bracket. See PIC.2. You may need to use a screwdriver to help “poke” the flange of the Rubber Intake Boot into position inside the Pro R-series Hypercharger. STEP 5 Line up the three holes in the back plate of the Pro R-series Hypercharger and the three holes in the flange of the rubber intake duct with the three holes in the main support bracket. Insert the three supplied 1/4″-20 x 5/8″ socket head cap screws from inside the Pro R-series Hypercharger and secure on the back side of the main support bracket with the 1/4″-20 thin nylock nuts. You will need to pull back the inner flange of the rubber intake duct to access the holes. Hold the nylock nuts with a 7/16″ wrench as you tighten the socket head cap screws with a 3/16″ hex key. Be careful not to over tighten and cause the rubber intake duct to pucker around the nylock nuts. See PIC.3.

VENOLIA Piston Installation Manual

0

Filed Under (Tips and Review) by admin on 15-11-2010

download
Cam Milled Side Reliefs The VENOLIA special profile is designed to remove excess weight without sacrificing reliability. It is one of the most critical operations in piston manufacturing. The milling cutter follows the contours of the master and works in much the same way as a cam grinder. Note: Cam milled reliefs are standard on some types of pistons. Nitrous Oxide When ordering pistons for use with nitrous oxide, please make note on the order form or inform your VENOLIA representative. Please specify the approximate amount of horsepower you plan on adding with the nitrous. Due to extreme demands on piston integrity by the increased cylinder pressure and temperature, VENOLIA will use a slightly different design criteria to insure maximum piston durability under these conditions. Bore Size The skirts on VENOLIA pistons are ground to fit the bore size. When ordering pistons, specify the exact bore size on the engine block. When boring the cylinders oversize, it is advisable to use standard overbore sizes. The standard overbore sizes are .020˝, .030˝, .040˝ and .060˝. Valve Clearance The lift of the cam does not determine the amount of clearance required in the valve pocket, the amount of overlap does. Give us the valve lift at overlap at T.D.C. and plus and minus degrees from T.D.C

TRIUMPH 750 BIG BORE CYLINDER AND PISTON SET FOR 650 TWINS INSTALLATION

0

Filed Under (Triumph) by admin on 29-10-2010

download
Step 1. Unpack your big bore kit and inspect the contents. There should be the following: 1. Cylinder x l 2. piston with wristpin x 2 3. Hepolite piston ring set x l 4. Special big bore head gasket Step 2. Thoroughly wash the cylinder bores with soap and water. Do not use solvent! Dry bores with air or a lint free towel and let completely air dry. This step is most important and will greatly extend the life of the pistons. Step 3. Following the procedure outlined in your service manual, drain the fuel tank, remove the exhaust system, fuel tank and carburetors. Have a catch basin handy to capture any fuel that may spill from the carburetors, as fuel is highly flammable and can be ignited by a dryer pilot light etc. from a long distance. Clean up any spilled fuel immediately and dispose of away from any source of ignition. Store the fuel tank in a well vented area, outdoors is best, in the event your fuel taps should leak. Step 4. Remove the rocker boxes by slacking the 9 head bolts a little at a time in a star pattern. Remove the 6 nuts at the front and back of the head. Remove the 4 corner rocker box bolts. Remove the head bolts and rocker boxes. Remove the push rods. Examine the push rods to insure they are straight and the ends are tight. Replace any suspect push rod. Step 5. Remove the cylinder head. Now would be a good time for guide and valve renewal. This is best left to an expert. More cylinder heads have been ruined by auto machine shops than by hard use. If you do not have a qualified shop in your area please call for a referral. Step 6. Remove the push rod tubes and the cylinder base nuts. Clip rubber bands around the top of the lifters to keep them from dropping into the crankcase. Have a few lint free rags handy. Bring the pistons to the top of the stroke and begin lifting off the cylinder. If the cylinder is hard to lift off, thread a nut on one of the base studs and use a tire lever to pry against the bottom fin close to its base using the stud as a fulcrum. After partially raising the cylinder stuff the crankcase mouth with rags to keep any carbon or broken rings from entering the crankcase. These will remain in place until step 12. Step 7. Leaving the rags in the crankcase remove the wrist pin circlips from the pistons and discard. Heat the piston and gently push the wrist pin out. Do not use force as this can damage the connecting rod or its bearings. Be sure to account for all the clips as one left in the crankcase can do extensive damage. Step 8. Clean all gasket surfaces to remove any traces of the old gaskets. Use Pennatex gasket remover if needed. Be very careful not to scratch the gasket surface or to allow any gasket particles to enter the crankcase. Even a small bit of gasket can stop the oil pump from working! Step 9. Note the direction and location of the lifters. These must be replaced in the same position as when removed. Remove the lifter blocks from the old cylinder. Start by removing the small retaining bolts and washers. The lifter blocks are extremely fragile and are easily broken. They are also very expensive so great care must be taken in this step! Triumph special tool 222-616008 is advisable here. Apply pressure to the center of the block only. Do not press against the tangs that locate the lifter! A tool can be fabricated using two dowels to locate in the lifter holes. Step 10. Clean and examine the lifters and camshaft faces. Clean the lifter blocks and remove the sealing oring under the locating flange. Replace these with the new orings in the gasket set. Apply a smear of gasket sealant to the lifter block oring and press into the new cylinder. Be sure the lifter block is parallel with the bores and the grooved block is on the exhaust side. Apply a small amount of assembly oil to the lifters and replace in the exact position they came from